Hydronic HVAC Repair at Cazenovia College in Cazenovia, NY
Challenge
Four story addition to the shove hall dormitory at Cazenovia College in Cazenovia, New York. A hydronic heating and air conditioning system and make-up air unit were used on this project. A complete installation of a plumbing system and electrical system were also included.
Solution
The hydronic system consists of 2-boilers, a cooling tower and heat pumps for the apartments. The make-up air unit supplies fresh air to the corridors on each floor.
The plumbing system consists of a water service, 1-boiler, 2-indirect hot water storage tanks, all plumbing fixtures, hot and cold water lines and re-circulation hot water lines.
The electrical system consists of an electrical service, distribution panels, lights, equipment power connections and receptacles.
Project Summary
General Contractor: Wilmorite Inc.
Engineer: Robson Woese Engineering
Architect: GPK Architects