Before
Before the installation of the crock and sump pump.
Cutting a hole
Our plumbing tech used a demo saw and jackhammer to cut a hole in the back corner of the basement.
Almost there!
The tech dug down about two feet.
New crock
The crock has been placed.
Filling the gaps
Stone was used to backfill around the perimeter of the new crock.
Concrete
After filling around the crock with stone, concrete was used to conceal everything.
The job is complete
The sump pump was installed and tested. You can see here that it was connected to an existing drain line. The lid was placed on the crock and the job is complete!