Renovated the Electrical Systems for the Nike Factory Store in Waterloo, NY
Challenge
Renovate existing electrical system for new shoe store in Waterloo Premium Outlet Mall.
Solution
Renovated the electrical service, wiring and lighting for the new Nike Factory Shoe Store in Waterloo, NY. The system was modified for the new store including wiring installation for the store signs, and a new fire alarm system was installed.
Project Summary
General Contractor: DeJager Construction