Canandaigua National Bank Brighton
Challenge
Install HVAC and plumbing systems.
Solution
Two furnaces and condensers were installed for heating and air conditioning. A boiler was indtalled for under floor heating.
The plumbing consists of a water service and gas piping for the furnaces and boiler.
Project Summary
General Contractor: Frank J Marainacci Inc