Click on a photo to enlarge.
This new toilet was installed in the basement for an Auburn, NY customer.
This Auburn, NY customer just moved into his house and was running through propane. His floors were always hot, and his high efficient boiler never turned off. Our service technician found a crossed wire on the zone control board that ran out to the customer’s pull barn where his open system coal fired boiler sits. This was turned off, but the crossed wires made a call for heat. Our tech removed the system from the main boiler system, cooling down the room directly above it 8°F while he worked. He also identified a failed expansion tank, a failed air vent, and a missing a back-flow preventer and an automatic water feed/ pressure reducing valve. He replaced the failed parts and installed the two missing parts making the boiler system code compliant. The customer was so happy with the service he decided to become a Halco Maintenance Agreement customer!
This Auburn, NY customer's pressure tank was waterlogged which made his well pump turn on every time he turned a faucet on. As this would eventually burn the pump out, we replaced the pressure tank and updated the piping.
This home in Port Byron, NY was fitted with a 9.81 kW roof-mounted solar array of 30 SunPower solar modules. As designed, the system should produce 11,787 kWh per year, which is equivalent to 110% of the customer's current annual electrical usage! Congratulations to this customer for taking a major leap towards energy independence and a clean environment!
our service area